正规的棋牌平台排行榜

Projects

Kimball

金博尔小学替换计划

Kimball 小学 is in their new school building for the 2023-24 school year.

新校舍启用

A ribbon-cutting ceremony marked the opening of the new school on Aug. 31, 2023. 读故事.

a yellow lion costume covers two people and a child holds a mask up next to it
Lion dancers leading the way through the school building
两个穿着黄色舞狮服的人
金博尔舞狮者在学校入学时表演
穿着红狮舞服装的人
红狮舞者在学校入口处表演
two people dressed in a white lion dancer costume at the bottom of a stairway with people watching from the stairs
舞狮者进入大厅
lion dancers stand on the stairs of a stage with three people standing behind them
舞狮演员走上舞台
a large group of people in front of a wall with a map
热情的观众
a group of people on a stage lean toward a red ribbon with scissors in their hands
剪彩仪式
三个人的腰部以下被展示出来. 中间的拿着一把巨大的剪刀
Principal Gray, Superintendent Jones, and President Hersey
A two story brick building has a walkway leading toward it
新金博尔小学入口
a three story building has the ground floor set back with a tile wall in rainbow stripes. 有一个两扇门的玻璃入口. A sign says Kimball 小学 School above the door.
新入口
a three story building has the ground floor set back with a tile wall in rainbow stripes. 有一个两扇门的玻璃入口. A sign says Kimball 小学 School above the door.
入口和墙砖的视野
a room with a counter that has a textured wood front
行政办公室
a classroom with groups of tables and a wall that is open to another classroom
有墙的教室通往相邻的教室
a classroom with desks in rows and an area rug with colored circles
Classroom
a group of lime green chairs sites on a turquoise rug in a corner with windows on both sides. an adult and a child site in the two of the seats
团体聚会空间
孩子们玩耍的体育馆
体育馆
3 teal-colored doors have a toilet icon and say student restroom
不分性别的独立卫生间
a wooden stair designed for sitting has words in several languages on the risers
学习楼梯
a large room has low bookshelves and a large wall of windows
图书馆在学校的中心
a paved walkway leads to a patio area that has seating. 它后面是一座三层楼的建筑
东侧为户外学习区
looking up a hill with trees and shrubs to a brown two story building
新校舍的东侧
木墙上刻有纹理
Close up view of one of the many textured surfaces within the school
桌子围成一圈的教室, 一面墙上有窗户,下面有书架, 白板和投影仪在另一面墙上
教室家具到位- 2023年8月
four red chairs sit on a blue area rug with a table between them. 一堵墙将它们与另一个区域隔开. 窗户在一面墙上
家具就位- 2023年8月
俯视着自行车棚里的白色屋顶
2023年8月,车棚安装雨棚
playground equipment sites on a green surfaced area with curbing around it. 它后面有一座建筑
游玩区的游乐设备- 2023年8月
an green turf area with soccer markings is in front of a building with playground equipment behind it
游戏场安装完成- 2023年8月
a paved area in front of a building has road lines and building outlines painted on it
游玩区的交通花园- 2023年8月
坡道通往山坡的坡道和人行道
Decking and access ramp complete on the hillside – August 2023
aerial view of two large buildings and a parking lot
航拍照片- 2023年8月
a wall has a indent that contains a very large section of folding wall covered with a map image
Operable partition between commons and gym – June 2023

Photos

金博尔小学的平面图
新金宝小学校址平面图
aerial photo of a neighborhood with an empty block sized lot
鸟瞰图-九月. 2021
people are looking at brightly colored tiles on a wall. they wall is partly tiled, and partly prepped for tiles
拐角处入口处附近的马赛克瓷砖- 2月. 2023
a hallway under construction has people working to install wood panels under windows with colorful window wells
斜坡上安装胶合板- 2月. 2023
a wall in a room under construction has colorful pieces of wod partially installed with light wood framing around the whole space
主入口附近的胶合板- 2月. 2023
looking up to a high ceiling that has a skylight framed in bright green
公共餐厅的天窗- 2023年3月
four pathways lead to a central circle with curved seating and boulders in the center
Concrete outdoor seating area east of the classroom building – April 2023
a table has textured wooden panels being installed on the side
Patterned wood panels are being used throughout the school – April 2023
舞台周围的舞台是用木头做的. 通向它的阶段和步骤是具体的
Glu-lam panels from the old building are installed in the commons – June 2023
a wall has a indent that contains a very large section of folding wall covered with a map image
Operable partition between commons and gym – June 2023
an empty gymnasium with basketball hoops, floor striping, and the word Cougars on the floor
Gym floor striping and finish complete – June 2023
aerial view of two large buildings and a parking lot
航拍照片- 2023年8月
a paved area in front of a building has road lines and building outlines painted on it
游玩区的交通花园- 2023年8月
an green turf area with soccer markings is in front of a building with playground equipment behind it
游戏场安装完成- 2023年8月
playground equipment sites on a green surfaced area with curbing around it. 它后面有一座建筑
游玩区的游乐设备- 2023年8月
俯视着自行车棚里的白色屋顶
2023年8月,车棚安装雨棚
four red chairs sit on a blue area rug with a table between them. 一堵墙将它们与另一个区域隔开. 窗户在一面墙上
家具就位- 2023年8月
桌子围成一圈的教室, 一面墙上有窗户,下面有书架, 白板和投影仪在另一面墙上
教室家具到位- 2023年8月

项目简介

The new three-story Kimball 小学 School provides the spaces and resources that students need for academic success. 大约95,000 square foot school meets the district’s elementary educational specifications and provides space for up to 650 students. It is designed to provide an equitable, safe, and inspiring learning environment for all students.

A collaborative process resulted in a plan that preserved valuable outdoor spaces that is used for both education and recreation. The design is organized into learning clusters with classrooms surrounding learning commons. Secure points of entry with visitor directed into the administration office before entering the school.

The new school building was thoughtfully designed to fit into the neighborhood with color choices that reflect natural elements. A canopy provides awaiting and gathering area near the front entrance.

可持续设计及建造

符合SPS的清洁能源目标, operation of the new school does not require any fossil fuels. 除了, the roof is designed to accommodate solar panels, which could offset 80% of the building’s energy use in the future.

减少能源使用的特点:

  • 地热供暖系统
  • Highly efficient ventilation that recovers heat before air leaves the school
  • 节能LED照明
  • 高度隔热的墙壁和屋顶
  • 高性能玻璃纤维窗户

其他可持续设计策略:

  • 雨水管理与雨水花园
  • 本地抗旱植物
  • 屏蔽现场照明,减少光污染
  • Demolition and construction debris sorted and recycled

预计能源使用指数(EUI): 18

设计公司: 南京汽车架构

承包商 :基石总承包商

项目预算: $86.4M

资金来源: Funded by the Building Excellence V (BEX V) Capital Levy, approved by Seattle voters in 2019.